01

Paying for efficiency

Many buildings waste energy through old chillers, inefficient lighting, leaky ducts and poorly set controls. Fixing them often pays back within a few years, yet owners hesitate. Upgrades need money up front, technical expertise and confidence that the promised savings will appear. An energy service company, or ESCO, offers to take on those barriers. It audits a building, designs improvements, installs them and often arranges the finance. In return, it is paid from the savings on the building's energy bills over an agreed period. The arrangement is called an energy performance contract. Its central idea is that the client pays for results, measured in reduced consumption, rather than for equipment alone.

02

Two contract models

Performance contracts usually follow one of two models. Under a guaranteed-savings contract, the building owner borrows the money, often from a bank, and the ESCO guarantees that savings will reach a set level. If they fall short, the ESCO pays the difference. Under a shared-savings contract, the ESCO or its financiers provide the capital and take an agreed share of the savings until the investment and its return are recovered. Contracts typically run for five to fifteen years. When they end, the owner keeps the upgraded equipment and the full savings. Which model suits a project depends on who can borrow more cheaply and who is better placed to carry the risk.

03

Proving the savings

The hardest part is proving what was saved, because savings are energy that was never used. ESCOs and clients therefore agree a baseline: how much the building would have consumed without the upgrade. Measured use after the retrofit is compared with that baseline, adjusted for factors such as weather and occupancy. A hotter summer or a fuller office should not count against the contractor. Many contracts follow the International Performance Measurement and Verification Protocol, a widely used framework for these calculations. Independent checks, meters on major equipment and clear rules for changing conditions help avoid disputes, which are a common reason performance contracts break down.

04

A worked example

Imagine an office tower whose upgrade costs AED 2 million and is expected to save AED 500,000 a year in electricity and water bills. The simple payback is four years. Under a seven-year shared-savings contract, the ESCO might take 80 per cent of the savings, AED 400,000 a year, totalling AED 2.8 million, which covers the investment, financing and its margin. The owner keeps the remaining AED 100,000 a year from day one, AED 700,000 over the contract, without spending capital, and then all the savings afterwards. These figures are illustrative only and not financial advice; real contracts vary widely in terms, risks and returns.

05

Dubai's model

Dubai has made ESCOs a central part of its demand-side strategy. In 2013 the Dubai Electricity and Water Authority set up Etihad Energy Services, known as Etihad ESCO, as a so-called super ESCO. It acts as a market builder: accrediting private ESCOs, standardising contracts, helping arrange finance and promoting retrofits of government and private buildings. The emirate has aimed to retrofit around 30,000 existing buildings by 2030. Typical measures include more efficient chillers and district cooling connections, LED lighting, building management systems, variable-speed drives on pumps and fans, and water-saving fittings. Because cooling dominates Gulf building energy use, upgrades to air conditioning often deliver the largest share of the savings.

06

Strengths and limits

The ESCO model shifts technical and financial risk to specialists and aligns their pay with real results. It has a long history: ESCOs grew up in the United States after the oil shocks of the 1970s and are now found in Europe, China, India and the Gulf. Yet the model has limits. Small buildings may not save enough to justify the cost of audits, contracts and verification. Split incentives, where landlords pay for upgrades but tenants pay the bills, can block projects. Disputes over baselines can sour relationships. Where these hurdles are managed, performance contracts turn efficiency from a cost into an investment with an agreed return.

FOLLOW THE EVIDENCE

Sources & further reading

Figures are rounded and widely published; check the linked organisations for the latest editions. These organisations do not endorse this website.